CSS were instructed to create and install the steel fabrication for a renovation project at this busy London hotel. A key part of the brief was that there should be minimal disruption on site so that guests were undisturbed during the works.

CSS produce detailed designs for the client to approve before fabrication. Installation was carefully planned to ensure noise was kept to a minimum and the works were conducted in a clean and safe environment throughout the duration of this project.

The client was very satisfied knowing they could achieve their renovation requirements with minimal interruption to their business. This was very important as the works were being carried out close to the hotel’s busy restaurant.