Hawley Mill Staircases

Dartford Project tonnage: 12t

Project Summary

Project tonnage:

12t

Plant and equipment:

n/a

Qualifications required:

SSSTS, Coded Welders/fabricators, Gold Card Erectors, Project Manager & Project Coordinator.

Hawley Mill is a commercial office building located on a highly sought-after business park in Dartford, close to the M2 and M25.

M2 Interiors instructed CCS to fabricate and install two large fire escape staircases to bring the building up to the required regulatory and safety standards.

The project was not straightforward because of ground levels and structures at the side of the building which restricted the main design. Discussions and site visits led to several design changes and additional input by our expert fabricators to complete two sets of staircases.  CSS operatives installed one staircase at a time, using a Hiab lorry to fix and hold while positioning the staircase to the correct level using precise measurements. M2 Interior was delighted with the completed works and that CCS were able to deliver complete packages from sourcing the correct steel, designing and fabricating the staircases and installing correctly on site.